Grid-equipment and power-infrastructure suppliers, conditional on confirmed orders, capacity and margins.
What changed in the economy this year, and what did not hold up.
Every signal on this page comes from an official record (SEC annual filings, EU tender notices) and links to it. Every trading idea we tested is listed with its result, including the ones that failed.
Who became more, or less, dependent on one customer
From each company's latest annual SEC filing: a customer's share of its revenue this fiscal year against last year. A rising share is concentration risk; a falling or lost customer can mean a contract ended.
The complete dataset — every disclosed customer relationship with share, period and source, refreshed weekly, as CSV or API.
Get the dependency data · $99 / monthTrading ideas we tested, and the verdict
We only call an idea supported after it survives trading costs and out-of-sample testing. Negative results stay public.
Open public contracts in digital and energy infrastructure
Official EU tender notices (TED), one row per notice. Open a notice for its value, lots and deadline. Listed suppliers are companies in our graph with a matching capability, not bidders.
Explore the underlying graph, markets and event research
The tools behind the signals above: relationship hypotheses from live headlines, global market context, the evidence graph and event research. Everything below is exploratory unless marked as verified.
See the system behind the event.
Trace infrastructure, capital and supply relationships through second- and third-order effects.
AI → power infrastructure
Data-center projects waiting for connections and operators unable to pass on costs.
Data-center load
New computing capacity can increase power density and demand for uninterrupted electricity.
- Metric to monitor
- Commissioned MW; actual electricity consumption
- Impact horizon
- Commissioning schedule
- Evidence status
- Source-backed general mechanism; event-specific transmission is unverified.
- Pricing
- Not assessed · no trade signal generated
What invalidates it?
Cancellations, low utilization or efficiency gains that offset additional load weaken the chain.
Alternative explanation
Grid renewal or industrialization may explain equipment demand instead of AI.
Evidence desk
IEA · Energy and AI2025 · General mechanism source · not confirmation of today’s eventLAST 30 DAYS · TITLE MATCHESA title match is only a research candidate, not verification of event direction, contracts or causality.
Loading event feed…
Coverage and methodology
Four source-backed mechanism models. Awaiting current source feeds.
Connections are editorial economic models. Titles are matched by keywords, without full-document analysis. Sector relevance does not identify the contract winner. Scores are not calibrated probabilities or claims of automatic profit.
Cross-region market confirmation
Live company-level confirmation across US, European and Asian technology, energy, banking and logistics exposure.
Highest-confidence relationships
From disruption
to a decision.
Trace infrastructure events into market exposure. Inspect the evidence, measure the costs, and test what remains.
One endpoint away from paid intelligence.
Agents can discover ShadowGraph through MCP and A2A, inspect a free live preview, then purchase only the intelligence they need through HTTP 402 / MPP.
POST /_api/machine/intelligenceMPP-compatible buyers receive a Stripe payment challenge and retry the identical request after settlement.Local evidence layer
KAP disclosures, local procurement and BIST confirmation remain available as a regional data pack — not the primary global product.